top of page

THE TOTAL BUILDING SOLUTION

construction-bg.png

WHY FRAMEMAX?

See innovation big and fast

Design, build and operate places to live and work always better adapted to expectations of our customers and users, in an innovative way and with innovative tools and materials to build a more respectful, harmonious, and efficient living environment, meeting economic and social challenges and environmental issues now and in the future.

cfs.jpg

FRAMEMAX'S ADVANCED TECHNOLOGY

There is no doubt that the world is changing at breakneck speed. This is rebuffed
possible by ever more dazzling scientific and technological progress; it is on this path
that FRAMEMAX works more and more in environments where technological advances
and innovation are essential factors for obtaining competitive advantages.
FRAMEMAX is the perfect component of experience and advanced technology in the
field of construction in cold-formed steel, its potential extends to local markets but also
to international.

Modern Building

Our Innovation

Framemax is the world leader in Cold Formed Steel (CFS) Systems and multi-story construction, holding worldwide patents for key systems, that are a much better alternative to concrete. Moreover, they are environmental friendly, and provide speed of construction and cost advantages.

FrameMax has dedicated engineering and design support with the intent of creating the world’s most reliable equipment. FrameMax Equipment has exceptionally high production capacity - 130 tons. Additionally, we provide warranties and service agreements to ensure the equipment is well maintained and highly reliable.

Glass Buildings

READ MORE ABOUT HOW TO BUILD A PROFITABLE COLD-FORMED STEEL FACTORY

FRAMEMAX SYSTEMS ADVANTAGES

bg-3.jpeg

The world’s most advanced cold-formed light steel building system for multi-story buildings

BIM2.png

Capable of building up to 16 stories using only cold-formed light steel in a short time

bg1.jpeg

Incorporates the best roll-forming technology available allowing:

 

High capacity of 9,000 ft (3,000 meters) per hour production, average of 8 tons/hour or 1500 sq. ft. (150 sq. m.) per hour of building area
 

Production line is able to produce from 3” (75mm) to 12” (300mm) width profiles from 20g (0.8mm) to 12g (2.5mm) gauge/thickness of steel with automatic adjustment in seconds between profiles and provide punches
 

Wall framing, floor joists and roofing frame components all produced accurately within 1/16th inch (1.5mm), on one production line using “non-stop” production technology.

9.28.07-5.JPG

Proven system used worldwide and in all environments (seismic areas, tough weather, coasts climate, desert climate, etc.)  with:
 

The largest cold-formed steel project in California; CalPoly San Luis Obispo; 3,000 bed student accommodation buildings
 

The largest project ever completed in cold-formed steel consisting of over 300 x 5 story buildings for the Algerian Ministry of Defense and 100 offices buildings, schools, hospitals and barracks
 

7 Story “mixed use” Wilshire Vermont project consisting of almost a complete city block, the largest of its type in Los Angeles
 

Numerous other high profiles, prestigious projects in the USA for Starwood Hotel, Sheraton, etc and other parts of the world; India, New Zealand, all completed directly by FrameMax staff
 

Numerous warehouses in Sudan

process-bg2.png

Comes complete with support in all aspects of the building system by the most experienced staff in cold-formed steel in the areas of:

 

Design and engineering

Production and roll-forming expertise

Fabrication and framing erection on-site

Supply of steel coil, fasteners, add-on steel products

Supply of all associated building products

Software Engineers

Complete with design software or access to design and engineering services to ensure the success of projects

THE COLD-FORMED STEEL SOLUTION

Faster Build Times (Speed)

Increase onsite construction speeds significantly with pre-fabricated panels

Merrill Gardens-1.jpg
LGS.jpg

Environment Friendly

Environmentally friendly, uses over 80% recycled materials

Leed eligible for recycled content

Lower energy usage

Less scrap and waste

Lower lifecycle cost

Quality Controlled Production

All pieces are rolled to precise length, leading to a higher quality panel and almost no job site waste.  Offsite assembly also allows for lower skilled workers to perform onsite installs.

Picture65.jpg
Picture20.png

Panels Fitted for Lifting
(Ease)

Less required handling of the materials leads to less potential damages

Prefabricated with Offsite Labor

offsitelabor.png

All pieces are rolled to precise length, leading to a higher quality panel and almost no job site waste.  Offsite assembly also allows for lower skilled workers to perform onsite installs.

Screen Shot 2021-06-16 at 4.03.11 PM.png
factory-setup.jpg

Sustainability & Insurance Saving

Resistant to rotting, termites, and mold

Offers superior fire ratings

Durable, straight, light-weight, consistent quality material

Affordability

Lower lifecycle cost – improved time value of money

Faster speed of construction 

Much lower energy use

Easy to remove

 

Lighter weight reduces foundation costs, especially in poor soil conditions

 

Labor costs makes steel an affordable option

construction-bg.png

Earthquake Resistance

Cold formed steel buildings are resistant to earthquakes

 

Designing shear walls to carry out the seismic loads

In a suitable design, the architectural result is comparable to all building styles and stability is unequivocal.

image.png

LEARN MORE ABOUT OUR PROCESS FOR COLD-FORMED STEEL CONSTRUCTION

bg1.jpeg

GET AN OVERVIEW OF OUR STATE-OF-THE-ART MANUFACTURING EQUIPMENT

Picture63.jpg

FM-1200ST-97

Multiprofile Roll Former Machine

FM-1200ST-68 (1).jpeg

FM-1200ST-68

Multiprofile Roll Former Machine

FM-150U50-54 (1).jpeg

FM-150U50-54

Roll Former Machine

fm-3600v0562-43.png

FM-3600V-43

Roll Former Machine

FM-52-118.png

FM-52-118

Shear Machine

FM-120-118.png

FM-120-118

Press Brake Machine

EXPLORE FRAMEMAX'S PAST & CURRENT PROJECTS USING COLD-FORMED STEEL TECHNOLOGY

Wilshire Vermont-1.jpg

PAST PROJECTS

construction-bg.png

CONSTRUCTIONS

cfs.jpg
Logo.jpg

Address

7040 Avenida Encinas Suite 104-27, Carlsbad, CA 92011

Social

  • Facebook

Contact

+1 (619) 432-7548

bizdev@framemax.com

© 2021 by FrameMax Systems.  All rights reserved.

bottom of page